Sheirdrim可再生能源开发 is located on the Kintyre Peninsula in Argyll and Bute.

目前的阶段

苏格兰能源 Renewables (SPR) application for a 134MW wind-hybrid renewable energy development in Argyll and Bute, 苏格兰 has been referred to the Scottish Government’s Planning and Environmental Appeals Division (DPEA). 有关申请的详情,可浏览本处网页:

Sheirdrim可再生能源开发

项目历史

As part of the development process two wind monitoring masts were installed within the site, one south of Sheirdrim Hill in August 2016 and another west of Cruach Nam Fiadh in June 2019. A Scoping report was submitted to the Scottish Government’s Energy Consent Unit in April 2019. In October 2019 a planning application was submitted to the Energy Consents Unit (ECU) for consideration.

可再生能源技术

A Section 36 application has been submitted to the Energy Consents Unit for 19 wind turbines, 太阳能电池阵列和能源储存设施.

Combining energy storage with wind and solar technologies presents a valuable solution for the development and will help to meet 苏格兰’s improved carbon emissions targets (75% reduction by 2030 and ‘net zero’ by 2040, 比整个英国快5年).

社区协商

早期咨询是我们开发项目的关键, and throughout the development process we ensure local communities and stakeholders are given the opportunity to provide feedback and are kept informed of project progress.

宣传日在克拉干举行, Whitehouse and Skipness in June 2019 along with engagement with the local and neighbouring Community Councils.

附近有现成的场地, SPR has a history of engaging positively with communities within the region. We are keen to ensure employment and the business skills required to maximise economic benefits can be delivered locally to ensure those who live near our sites benefit.

好处

特别方案资源将继续致力于促进当地就业, skills and inward investment and will actively engage with local communities and businesses.  During the construction phase alone the development is expected to support over 300 jobs in 苏格兰 with approximately one third of these opportunities benefitting local residents.

到目前为止, SPR has voluntarily awarded over £2 million in community benefit funding to communities in Argyll & Bute, helping to support a wide range of local projects and community initiatives including: 

  • 超过£90,提高能源效率, 各地方村堂的一般维护和设备.
  • 超过45万英镑用于青少年 & 教育活动,包括提高技能.
  • £12,000 towards the refurbishment and running costs of the Campbeltown Picture House.
  • £10,700 to support the Kintyre Way route and Kintyre Way Ultra events
  • 向金泰尔社区透析中心捐款7500英镑.

特别方案资源致力于为当地的进一步项目提供资金, including those identified in various local community council action plans, 哪些可以改善社区建筑, 支持新服务,扩大农村基础设施. 

我们热衷于讨论一项社区福利计划, 为满足周边社区的需求而量身定制, and which has the capability to support the areas long term development ambitions.

网站的改进

  • The project will facilitate the construction of a hide where various interesting species and habitats in the area can be observed and enjoyed. 
  • A viewpoint will be installed at the highest point of Cruach nam Fiadh giving views over the landscape.
  • Hydrological improvements will be made in various locations which will assist with flooding concerns over Clachan burn.
  • Archaeological features identified during site visits will be preserved and enhanced by improving access and through installation of display boards. 
  • Footpaths linking the Kintyre Way to the site will be constructed to open access into and through the site.
  • Examples of Ecological Activity at 苏格兰能源 Renewables' 陆上风力farms can be found here: 改善环境

设计注意事项 & 进化 

The site design has been reached through feedback from consultees and communities, where positions of renewable technologies and associated infrastructure have evolved through an iterative design process to achieve a final layout sympathetic to environmental constraints and the surrounding landscape.  

决定将布局减少到19台,最多可达149台.9米到顶端, allowed for 7 fewer turbines to be used (from initial scoping layout) which provided the opportunity for the co-location of other technologies. 太阳能电池阵列被认为适合该地点, 更是如此, since the reduced number of turbines freed up space in the land which was considered adequate for areas of solar development. 类似的, 考虑了储能技术, of which battery technology was identified as being the most suitable, 目前. Energy storage will help enhance the flexibility of the Renewable Energy Development.

联系

The Sheirdrim可再生能源开发 Project Team can be contacted directly by 电子邮件

项目文件

Please click on the links below to view the Sheirdrim可再生能源开发 EIA Report documents.

项目简介单张